

We have worked with Newtown Primary School in Trowbridge for many years developing their extensive outdoor space. Along with a recent MUGA installation and separate Kickabout Area, the school were also aware of the need to provide space for reflection in quieter space within their outdoor grounds. Newtown Primary School had a good-sized, unused area where many years ago there used to be a pond with the ground now having drainage issues.
The pond was situated beneath mature trees and overgrown Bamboo!
We were invited to re-design and revitalise this area into a Quiet Garden suitable for Free Play and Outdoor Learning. Within this design we were to include plans to deal with poor drainage and the overgrown nature of the existing space.
Our initial consideration was to make the area safe and clear out unnecessary planting and branches and to level the whole area. From this blank canvas, we designed a space that would be:
Originally published Oct 27, 2021 1:42:03 PM , updated January 30, 2024
Blackfield Primary School
HampshireWe are very pleased with the work done - please pass on our thanks to all the team.
The kids are loving the new play equipment and we have had lots of positive feedback from staff, children and parents.
And many thanks to you all - good job!
Ashton Gate Primary School
BristolI just wanted to say thank you for the wonderful efforts by your team during the playground installation at KAPSC. It looks great!
The team were really great, hardworking and. professional as well as tidy!
We are looking forward to the children using their new playground over the last few weeks!
Krishna Avanti Primary School
Croydon